What You're Viewing: Interactive Analysis Report

This sample demonstrates Deliverable #1 - the interactive online report you'll receive after uploading your drawings. Browse detected issues, use AI chat for questions, filter by severity, and track resolution progress with your team.

✓AI-powered issue detection
✓Real-time collaboration
✓PDF export for clients
Live Demo Report
🌍Multi-Jurisdiction
🇬🇧 🇮🇪 🇦🇺 🇳🇿 🇨🇦 🇺🇸9 Countries

Drawing Preflight Report

Community Youth Centre • 3-Storey Mixed Use

💰
£47,330 Potential Savings
Fix now vs fixing during construction

Executive Summary

Project Overview

Community Youth Centre • 3-Storey Mixed Use Building

Ground floor plan reviewed with full Building Regulations compliance check

Key Findings

11 issues detected across coordination, compliance, and specification

£47,330 in construction rework costs avoided

3h 52m saved vs manual review (97% faster)

2Critical
3High
4Medium
2Low
🔒
UK GDPR Compliant
Secure & Private

Issues by Priority Level

Total issue count organized by severity (11 issues detected)

2
Critical Issues
Fix immediately
3
High Priority
Address before issue
4
Medium Priority
Review and fix
2
Low Priority
Improve quality
⏱️

Time Saved vs Manual Review

Architects typically spend 4 hours manually checking drawings for these same issues

Manual Review
4:00
hours
→
ARQYN Analysis
8:42
minutes
=
Time Saved
3h 52m
97% faster
£305 saved per report at £80/hour billing rate
Based on average architect hourly rate

📋 Detected Issues & Findings

Browse and filter all issues detected in your drawings. Use AI features to prioritize and resolve efficiently.

⚡
3 issues include an ARQYN Detail Library download — plan views, sections & multi-detail sheets in JPEG, PDF & DWG.
11/11
🚨

Top 3 Priority Issues

Fix these critical and high-priority items immediately to avoid costly delays

1
critical

Fire escape corridor width below minimum requirement

Location:Ground Floor Plan, Grid B-C, Corridor C-01
Cost Impact
£8,500
Schedule Risk
14 days
2
critical

Fire door opening into protected corridor

Location:Ground Floor Plan, Room G.12, Grid C3
Cost Impact
£15,000
Schedule Risk
21 days
3
high

Disabled WC dimensions non-compliant

Location:Ground Floor Plan, Room G.14, Grid D2
Cost Impact
£6,500
Schedule Risk
10 days
💡Quick Action: Use the Smart Search below to find related issues (e.g., try "fire safety" or "Part M")

Deliverable #2: Color-Coded Drawings

✓ Live Now

When you export your reports, your original drawings return with color-coded issue markers – not just red lines, but a smart red/orange/yellow/green severity system. See critical issues instantly. Share with contractors, import to CAD, or mark up in meetings.

✓Color-coded by severity
✓Linked to report
✓PDF export ready

ARQYN Color-Coded Drawing

Community Youth Centre — Ground Floor Plan

Ground Floor Plan · Rev A
10 Issues MarkedLive Overlay
Community Youth Centre - Ground Floor Plan
ARQYN AIAI Overlay
10 IssuesColour-Coded
High-ResPrint-Ready PDF
Generated by ARQYN AI
Community Youth Centre Development
Color-Coded:
Oct 14, 2025 · Page 1 of 8
🎯
Interactive Markers — Try It!

Hover over any numbered marker on the drawing to see it highlight, then click to instantly jump to the full issue details below. Included in all plans.

💡
Two Deliverables Work Together:
1.
Interactive Report (above) — Click issues, filter by severity, use AI chat assistant, assign team members
2.
Color-Coded PDF (this) — Smart visual overlay with severity markers. Perfect for contractors, site meetings, or CAD import.
📤

Export & Share

Download as PDF, share with contractors, or import markup data back into Revit/AutoCAD for quick fixes.

🎯

Pinpoint Accuracy

AI marks exact locations on your drawings - no more hunting through sheets to find where issues are.

🔗

Synced With Report

Every marker ID links to the interactive report above - see the full analysis, cost impact, and fix template instantly.

📝
ISS-004highspecification
AI Risk:82/100
→Click to update progress:

Partition wall fire rating not specified

Partition wall between Kitchen G.03 and Dining Room G.04 shows no fire rating specification. Part B requires 30-minute fire resistance for commercial kitchen separations.

Location: Ground Floor Plan, Grid C-D between Rooms G.03/G.04
Regulation: Building Regulations Part B (Fire Safety) - Approved Document B, Table A2
⏰
⚠️ Schedule Impact
Potential 7-day delay if not resolved
Delay cost: £14,000 (£2k/day contractors on standby)
Fix Now
£0
Drawing phase
If Unfixed
£4,200
Construction
Avoided
£4,200
100% saved 🎯
✓ Recommendation: Specify partition as FD30 fire-rated construction. Add note: "100mm metal stud partition with 2 layers 12.5mm fire-rated plasterboard each side, joints staggered."
📋Fix Template
FIRE-RATED PARTITION SPECIFICATION:
Wall Type: FP-01 (Fire Partition 30min)
Location: Between Kitchen G.03 and Dining G.04

Construction:
• 100mm metal stud framework at 600mm centres
• 2 layers 12.5mm fire-rated plasterboard each side
• Joints staggered min. 600mm
• Acoustic insulation: 100mm mineral wool (optional)
• Fire stopping at wall/ceiling junction
• Compliance: 30min fire resistance to BS 476-22
⚡ ARQYN Detail LibraryInstant Fix Detail
Masonry Chimney — Fire Compartmentation Section
SECTION DETAIL

Masonry Chimney — Fire Compartmentation Section

High-level section showing non-combustible mineral wool insulation, DPC lead tray, weep holes, and fire separation requirements for masonry construction adjacent to combustible materials. Minimum clearances and fire isolation specification included.

Download:
📐
ISS-009lowdrawing
AI Risk:28/100
→Click to update progress:

Wall type annotation missing on partition

Partition wall between Rooms G.06 and G.08 shows no wall type reference. Drawing key shows types WP-01 to WP-05 but this wall is unlabelled.

Location: Ground Floor Plan, Grid B3-B4
Fix Now
£0
Drawing phase
If Unfixed
£180
Construction
Avoided
£180
100% saved 🎯
✓ Recommendation: Add wall type annotation (likely WP-02 based on location). Verify acoustic requirements and update if needed.
📋Fix Template
WALL TYPE ANNOTATION:

Missing wall type: Partition between G.06 and G.08

Recommended annotation: WP-02
• 100mm metal stud partition
• Single layer 12.5mm plasterboard each side
• 50mm acoustic insulation (Rw 40dB)

Add to plan:
• Wall type label "WP-02" at mid-span
• Reference to wall types legend
• Verify specification matches room acoustic requirements
⚡ ARQYN Detail LibraryInstant Fix Detail
Window with Full Brick Reveal — Wide Cavity Plan
PLAN VIEW DETAIL

Window with Full Brick Reveal — Wide Cavity Plan

Fully annotated cavity wall plan detail showing 102.5mm facing brickwork, 150mm mineral wool insulation, 100mm blockwork, cavity closer, air tightness tape, and MDF cill. Use as reference for wall type specification and annotation.

Download:
📝
ISS-011mediumspecification
AI Risk:64/100
→Click to update progress:

Glazed bay window abutment detail not shown

Proposed glazed bay window at south elevation (Grid E4, Reference GB-01) has no accompanying detail drawing showing cavity wall abutment, DPC cavity tray, structural steel support, or U-value compliance. Building Control will require this information before approval.

Location: South Elevation, Grid E4 — Glazed Bay Reference GB-01
Regulation: Building Regulations Part C (Resistance to Contaminants and Moisture) and Part L (Conservation of Fuel and Power) — U-value compliance documentation required
⏰
⚠️ Schedule Impact
Potential 8-day delay if not resolved
Delay cost: £16,000 (£2k/day contractors on standby)
Fix Now
£0
Drawing phase
If Unfixed
£4,800
Construction
Avoided
£4,800
100% saved 🎯
✓ Recommendation: Provide section detail showing cavity wall abutment, lead apron flashing, DPC cavity tray with weep holes, structural steel beam to engineer's spec, glazing U-value compliance (max 1.4 W/m²K), and perimeter insulation specification.
📋Fix Template
GLAZED BAY WINDOW ABUTMENT DETAIL — GB-01:

Required drawings/information:
• Detail A: Structural silicone glass-to-glass joint
• Cross Section A-A: Full roof-to-wall abutment

Specification notes to include:
• Lead apron flashing or rigid metal equivalent
• DPC cavity tray — turned down on four sides with weep holes
• Cavity insulation: continuous through junction (no cold bridge)
• Structural support: UC steel beam to Structural Engineer's spec
• Glazing: U-value ≤1.4 W/m²K to BS6399 Wind & Snow loading
• Floor transom: anodised aluminium to manufacturer's spec
• Perimeter floor insulation: 30mm rigid, sealed to airtight membrane
• Thermabridge connector plate at cold bridge locations

Coordinate with:
• Structural Engineer (beam size, wall support above)
• Glazing manufacturer (transom spec, silicon joint detail)
• Building Control (U-value evidence / SAP calculation update)
⚡ ARQYN Detail LibraryInstant Fix Detail
Glazed Bay Window with Monopitched Roof
MULTI-DETAIL SHEET

Glazed Bay Window with Monopitched Roof

Complete abutment detail including Detail A (structural silicone glass-to-glass joint), DPC cavity tray, lead apron flashing, insulated floor transom, Thermabridge connector plate, and Cross Section A-A showing full roof-to-wall construction with U-value compliance notes.

Download:
📋
ISS-001criticalcompliance
AI Risk:95/100
→Click to update progress:

Fire escape corridor width below minimum requirement

Main escape corridor between Grids B-C measures 1050mm width. Part B requires minimum 1200mm for corridors serving more than 60 persons.

Location: Ground Floor Plan, Grid B-C, Corridor C-01
Regulation: Building Regulations Part B (Fire Safety) - Approved Document B, Section 3.21
⏰
⚠️ Schedule Impact
Potential 14-day delay if not resolved
Delay cost: £28,000 (£2k/day contractors on standby)
Fix Now
£0
Drawing phase
If Unfixed
£8,500
Construction
Avoided
£8,500
100% saved 🎯
✓ Recommendation: Increase corridor width to minimum 1200mm. This may require relocating partition wall at Grid B or reducing adjacent room sizes.
📋Fix Template
ESCAPE CORRIDOR WIDTH COMPLIANCE:
• Current width: 1050mm (non-compliant)
• Required width: 1200mm minimum (>60 persons)
• Proposed solution: Shift partition wall at Grid B by 150mm north
• Impact: Room G.05 reduces from 4.2m to 4.05m (acceptable)
• Clear width maintained along entire corridor length
• Verify all door swings do not encroach into required width
• Update fire strategy drawing to reflect changes
🔄
ISS-002criticalcoordination
AI Risk:92/100
→Click to update progress:

Fire door opening into protected corridor

Door D-108 from Store Room G.12 opens outward into protected escape corridor, reducing effective corridor width below 1200mm when open.

Location: Ground Floor Plan, Room G.12, Grid C3
Regulation: Building Regulations Part B (Fire Safety) - Approved Document B, Section 3.15
⏰
⚠️ Schedule Impact
Potential 21-day delay if not resolved
Delay cost: £42,000 (£2k/day contractors on standby)
Fix Now
£0
Drawing phase
If Unfixed
£15,000
Construction
Avoided
£15,000
100% saved 🎯
✓ Recommendation: Reverse door swing to open into Store Room G.12 (inward). Verify 300mm clear space inside room for accessible door operation.
📋Fix Template
FIRE DOOR SWING CORRECTION - D-108:
• Current: Door opens outward into corridor (non-compliant)
• Required: Door must open into room (away from escape route)
• Update door schedule: D-108 swing direction reversed
• Verify room clearances:
  - 300mm clear space beside door when open
  - No obstruction from shelving/equipment
• Update ironmongery schedule (hinges, closer position)
• Coordinate with fire strategy consultant
• Apply check to all doors opening onto protected corridors
📋
ISS-003highcompliance
AI Risk:88/100
→Click to update progress:

Disabled WC dimensions non-compliant

Accessible WC (Room G.14) shows 1400mm x 1800mm clear space. Part M requires minimum 1500mm x 2000mm for wheelchair turning.

Location: Ground Floor Plan, Room G.14, Grid D2
Regulation: Building Regulations Part M (Access) - Approved Document M, Diagram 2.6
⏰
⚠️ Schedule Impact
Potential 10-day delay if not resolved
Delay cost: £20,000 (£2k/day contractors on standby)
Fix Now
£0
Drawing phase
If Unfixed
£6,500
Construction
Avoided
£6,500
100% saved 🎯
✓ Recommendation: Increase WC dimensions to minimum 1500mm x 2000mm. Relocate hand basin if necessary. Verify door swing clearance meets 300mm requirement.
📋Fix Template
ACCESSIBLE WC COMPLIANCE - ROOM G.14:
• Clear floor space: Minimum 1500mm x 2000mm (currently 1400mm x 1800mm)
• Revise walls to achieve compliant dimensions
• Relocate hand basin to side wall (maintain 400mm clearance from corner)
• Door swing: Verify 300mm clear space beside door opening
• Transfer space: Ensure 1100mm alongside WC pan
• Grabrails: Confirm positions per Diagram 2.6, Part M
🔄
ISS-005highcoordination
AI Risk:75/100
→Click to update progress:

Door swing conflicts with fixed furniture layout

Door D-102 to Meeting Room G.07 swings inward, clashing with fixed credenza unit shown on furniture layout at 450mm from door frame.

Location: Ground Floor Plan, Room G.07, Grid B4
Fix Now
£0
Drawing phase
If Unfixed
£1,800
Construction
Avoided
£1,800
100% saved 🎯
✓ Recommendation: Relocate credenza unit minimum 900mm from door frame or reverse door swing to open outward into corridor. Verify corridor width maintained.
📋Fix Template
COORDINATION NOTE - DOOR/FURNITURE CLASH:
Room G.07, Door D-102 / Credenza Unit

Option A (Preferred): Relocate credenza 450mm east
• Minimum 900mm clearance from door swing
• Maintains door opening inward (quieter for meeting room)
• Credenza remains on same wall

Option B: Reverse door swing to open outward
• Furniture position unchanged
• Check corridor width remains >1200mm
• Update door schedule D-102 and ironmongery
• Consider acoustic impact (door opening into corridor)
📐
ISS-006mediumdrawing
AI Risk:45/100
→Click to update progress:

Room labels missing on three spaces

Rooms at Grid E2, E3, and F1 show no room numbers or names. All spaces require clear identification for construction and fit-out coordination.

Location: Ground Floor Plan, Grids E2, E3, F1
Fix Now
£0
Drawing phase
If Unfixed
£250
Construction
Avoided
£250
100% saved 🎯
✓ Recommendation: Add room labels following existing format (e.g., G.15 - Store, G.16 - Server Room, G.17 - Cleaners Cupboard). Update room schedule and door schedule accordingly.
📋Fix Template
ROOM LABELLING UPDATE:
Missing room labels to be added:

Grid E2: G.15 - STORE (8.5m²)
• Update room schedule with area
• Add to door schedule (Door D-115)

Grid E3: G.16 - SERVER ROOM (12.2m²)
• Update room schedule with area
• Specify cooling requirements note
• Add to door schedule (Door D-116)

Grid F1: G.17 - CLEANERS CUPBOARD (3.8m²)
• Update room schedule with area
• Add to door schedule (Door D-117)
📝
ISS-007mediumspecification
AI Risk:58/100
→Click to update progress:

Door type inconsistent in door schedule vs plan

Door D-105 shown as FD30S fire door in door schedule, but floor plan shows standard door symbol with no fire rating indication.

Location: Ground Floor Plan, Room G.09, Grid C4
Fix Now
£0
Drawing phase
If Unfixed
£2,200
Construction
Avoided
£2,200
100% saved 🎯
✓ Recommendation: Update floor plan to show fire door symbol (double line) for D-105, or correct door schedule if fire rating not required. Verify with fire strategy.
📋Fix Template
DOOR SCHEDULE COORDINATION - D-105:

Current Discrepancy:
• Door Schedule: FD30S fire door
• Floor Plan: Standard door symbol (no fire indication)

Resolution Required:
1. Verify fire strategy: Is FD30S required for Room G.09?
2. If YES: Update plan symbol to fire door (double line, "FD" label)
3. If NO: Update schedule to standard door type

Fire Door Symbol Standards:
• Double line on plan (3mm apart)
• Label "FD30S" adjacent to door
• Self-closing device indication (diagonal line)
📋
ISS-008mediumcompliance
AI Risk:68/100
→Click to update progress:

Accessible ramp gradient exceeds maximum slope

External access ramp at main entrance shows 1:10 gradient. Part M requires maximum 1:12 gradient for wheelchair access ramps.

Location: Ground Floor Plan, Main Entrance, Grid A1
Regulation: Building Regulations Part M (Access) - Approved Document M, Section 2.7
⏰
⚠️ Schedule Impact
Potential 5-day delay if not resolved
Delay cost: £10,000 (£2k/day contractors on standby)
Fix Now
£0
Drawing phase
If Unfixed
£3,100
Construction
Avoided
£3,100
100% saved 🎯
✓ Recommendation: Reduce ramp gradient to maximum 1:12. This will require extending ramp length or reducing level change. Add handrails both sides.
📋Fix Template
ACCESSIBLE RAMP COMPLIANCE:

Current: 1:10 gradient (non-compliant)
Required: 1:12 maximum gradient

Level change: 250mm
Current length: 2.5m
Required length: 3.0m (250mm ÷ 12 = 3.0m minimum)

Updates Required:
• Extend ramp length by 500mm
• Handrails both sides: 900-1000mm high
• Landings: Min 1500mm x 1500mm at top/bottom
• Surface: Non-slip finish, max 5mm upstands
• Colour contrast: Nosing and handrail ends
📝
ISS-010lowspecification
AI Risk:35/100
→Click to update progress:

Floor finish not specified in two rooms

Floor finish schedule shows no specification for Rooms G.11 (IT Room) and G.13 (Comms Room). All rooms require defined floor finishes.

Location: Ground Floor Plan, Rooms G.11 & G.13
Fix Now
£0
Drawing phase
If Unfixed
£800
Construction
Avoided
£800
100% saved 🎯
✓ Recommendation: Specify appropriate floor finish: "FF-04 - Raised access floor 150mm with carpet tiles" for IT/Comms rooms. Update floor finish schedule.
📋Fix Template
FLOOR FINISH SPECIFICATION:

Rooms G.11 (IT Room) & G.13 (Comms Room):

Specified Finish: FF-04
• Raised access floor system
• Floor depth: 150mm (for cable management)
• Surface: Heavy duty carpet tiles
• Load rating: Medium duty (3.0 kN/m²)
• Fire rating: Class 1 surface spread of flame

Installation Notes:
• Coordinate with electrical for underfloor power/data
• Perimeter closure strips required
• Access panels at grid intersections
🧠

AI-Detected Issue Clusters

Issues grouped by category and theme (same 11 issues, organized differently)

🗺️

Severity Heatmap

Location-based distribution showing where issues are found on site (same 11 issues, by location)

Grid B-C
2
Critical Issues
Corridor + Fire door
Grid C-D
2
High Priority
WC + Partition
Grid B4 + A1
3
Medium Issues
Door + Ramp + Schedule
Grid E-F
2
Low Priority
Labels + Wall type
G.11/G.13
1
Specification
Floor finish missing
🔮

Predictive Issue Detection

AI-Powered
⚠️
Pattern Detected

Possible Additional Fire Safety Gaps

You have 3 fire safety issues clustered. AI analysis suggests checking:

  • • Fire door self-closing devices specification
  • • Protected corridor smoke ventilation requirements
  • • Fire stopping details at partition junctions
Confidence: 87%
🔍
AI Recommendation

Potential Coordination Issues

Based on door/furniture clash detected, high probability of additional conflicts in:

  • • Other meeting rooms with fixed furniture layouts
  • • Door swings vs corridor furniture/equipment
  • • Accessible turning circles in WC lobbies
Confidence: 92%
📐
Consistency Check

Drawing Schedule Inconsistencies

Door schedule vs plan discrepancy detected. AI suggests verifying:

  • • All fire door symbols match schedule ratings
  • • Room finishes schedule completeness
  • • Mullion/transom grid consistency
Confidence: 78%
✅
Good Practice Detected

Strong Accessibility Compliance

Most Part M requirements are well-specified. Only 2 minor issues found:

  • ✓ Level access thresholds: Compliant
  • ✓ Corridor widths: All adequate
  • ⚠️ WC dimensions + Handrail height need adjustment
Overall: Excellent
📖

How to Use This Report

1️⃣ Review Issues

Browse through all detected issues above. Use filters to focus on Critical/High priority items first.

2️⃣ Copy Fix Template

Each issue has a "Copy to Clipboard" button. Click it to copy the ready-to-use specification text.

3️⃣ Update Your Drawings

Paste the specification into your Revit/AutoCAD drawings and make the necessary updates.

4️⃣ Mark as Resolved

Come back here and click the status button to mark the issue as "In Progress" or "Resolved".

5️⃣ Share with Team

Invite team members to collaborate. Status updates and comments sync in real time across your whole studio.

🔄Real-time sync: Status changes update instantly for all team members — no manual refresh needed.
Ready to Get Started?

Catch Every Error Before Construction

Join architects saving 4+ hours per review while protecting their projects from costly construction rework.

97%
Faster Analysis
vs manual review
£305
Saved Per Report
at £80/hour rate
100%
ROI Guarantee
Cost avoidance
Get Started

Instant access • Secure payments • Cancel anytime

📄

Professional PDF Export

Share polished reports with clients, contractors, and planning authorities

✓
Client-Ready Format
Professional layout with your branding
✓
Print-Optimized
High-quality PDF for physical distribution
✓
Complete Data
All issues, templates, and cost analysis
✓
One-Click Export
Generate reports in seconds
ARQYN DRAWING PREFLIGHT REPORT

Community Youth Centre

3-Storey Mixed Use • Report ID: RPT-2024-1089

Generated
09 Oct 2025
2
Critical Issues
3
High Priority
3
Medium Priority
2
Low Priority
CriticalISS-001

Fire escape corridor width below minimum requirement

Location:Ground Floor Plan, Grid B-C, Corridor C-01
Regulation:Building Regulations Part B (Fire Safety) - Section 3.21
✓ Recommendation
Increase corridor width to minimum 1200mm (currently 1050mm). Shift partition wall at Grid B by 150mm north.
Total Construction Costs Avoided
£47,330
By fixing issues in drawing phase
100% cost avoidance
Generated by ARQYN • www.arqyn.com
Page 1 of 12
Professional PDF export includes all issues, fix templates, regulations, and cost analysis in print-ready format

Ready to catch every error in your drawings?

Get started today and protect your projects from costly errors.